WPIP MIP V Investment Measures

UKR Berat - WPIP / MIP V investment measures

Waste Water System

  • Construction of a new Wastewater Treatment Plant (WWTP) of 49,500 PE capacity with
    mechanical and biological treatment, sludge treatment and solar sludge drying.
  • Construction of about 3 km main collector sewer to the new WWTP
  • Construction of new sewer pumping station for connecting Gorica area to the sewer network by crossing the river via the Ura e Re bridge
  • Improvement and upgrading of the stormwater / sewer structure for separating stormwater
    from sewer network (construction of 7 sewer overflows (CSO 01 to CSO 07))

Overview of main works carried out under the WPIP / MIP V program

Key impact: new wastewater collection and treatment system assures clean environment