Drinking Water Supply

  • Shengjin water supply system: About 3.8 km new transmission main and rehabilitation of existing wells
  • Kodra Marlekaj: new distribution network (about 13.5 km pipes) and booster pump station
  • Kakariq & Gocaj Village Water Supply System:
    2 new wells, new reservoir of 400 m3 and new distribution net work (over 23 km pipes)

Storm water system

  • Complete redesign of the stormwater network in order to capture a maximum of the outer/rural areas on the hillside and to avoid discharge to low-lying areas in the city-centre
  • Separation of wastewater from storm water in the network;
  • For Disaster Risk Reduction: new box culverts, sediment traps, construction and rehabilitation of stormwater pumping stations.

Waste Water System

Upgrading and modernisation of Wastewater Treatment Plant through the following detailed measures protection of environment:

  • Rebuilding of mechanical treatment unit
  • New inlet pumping station
  • New fine screen building
  • New Venturi Parshall flume for flow measurement.
  • New aerated grit and grease chambers with blowers
  • New biofilter for odor removal
  • New phosphorus removal plant.

 

 

Key impact: two completely new networks - more safety for people from stormwater