WPIP MIP V Investment Measures

UKR Vlorë - WPIP / MIP V investment measures

Drinking Water Supply works

  • Rehabilitation / replacement of the Water Supply Distribution Network Vlora with a total network length of 96.9 km with 5,361 house-connections and 171 fire hydrants
    serving a population of ca. 95,400
  • Rehabilitation of the Old Town Reservoir
  • 5,500 new consumer customer water meters assuring reading based billing and monitoring /
    control of potential water losses
  • Rehabilitation and upgrade of DMA system
  • Upgrade and improvement of SCADA system for monitoring and controlling reservoirs,
    chlorination, main pumps and DMAs (reducing water loss and increasing revenues)

Flood protection

  • Rehabilitation of the Sea Water Protection Dam for protecting the 3 major pump stations PS4, PS6 and PS7

Aerial view of Pumping Station 6 - Rehabilitation of Sea Water Protection Dam

Key impact: 24/7 water supply for over 95,000 inhabitants