Documents for Download

You find on this page documents for viewing and downloading for the following topics:

Regional Campaigns – End of 2025 and beginning of 2026 about 130,000 leaflets for Elbasan, Fier and Lezhe were sent to the UKRs and from there distributed with invoices. In addition a specific Factsheet as well as a poster was produced for each UKR were produced and printed. Below you find the documents for viewing and downloading

WPIP MIPV Survey – a series of 3 consecutive surveys is being carried out targeting the citizens of Shkodra, Lezhe, Elbasan, Fier, Berat and Vlora for identifying the level of awareness of the citizens on the municipal water and wastewater services and objectives, on the WPIP / MIP V investment programme, and on the EU water policy and priorities – find documents here: WPIP MIPV Survey Report

WPIP / MIPV Project Information – WPIP MIPV Project Brochure and Poster

2025 Campaign ‘Friends of Water’ – view and download campaign materials here: Friends of Water Campaign Material

 
 
REGIONAL CAMPAIGN LEZHA

Lezhe_Poster_A2_print

Size: 6.42 MB
Date added: 04-06-2026

Lezhe_Invoice_print

Size: 3.90 MB
Date added: 04-06-2026

Lezhe_Factsheet_4_Pages_print

Size: 10.81 MB
Date added: 04-06-2026

REGIONAL CAMPAIGN ELBASAN

Elbasan_Poster_A2_print

Size: 9.12 MB
Date added: 05-06-2026

Elbasan_Leaflet_Invoice_print

Size: 3.89 MB
Date added: 05-06-2026

Elbasan_Factsheet_4_Pages_print

Size: 13.25 MB
Date added: 05-06-2026

REGIONAL CAMPAIGN FIER

Fier_Poster_A2_print

Size: 6.26 MB
Date added: 05-06-2026

Fier_Leaflet_Invoice_print

Size: 3.96 MB
Date added: 05-06-2026

Fier_Factsheet_4_Pages_print

Size: 11.72 MB
Date added: 05-06-2026

REGIONAL CAMPAIGN SHKODRA

WPIP MIPV Survey Reports

2026 Survey WPIP MIPV Wave 2 - INTERMEDIARY SURVEY

In the wave 2 of our study we are seeing very positive momentum across the key metrics, particularly regarding program visibility and stakeholder sentiment.
Size: 1.14 MB
Date added: 04-06-2026

2025 Survey WPIP MIPV Wave 1 - BASELINE SURVEY

800 face to face interviews have been carried out during the period from 23.12.2024 up to 14.01.2025. Chapters 1 to 6 present the findings Chapter 7 presents the 'Index of Awareness of the WPIP / MIPV Programme' and the ' Index of perception towards WPIP/MIP V Programme
Size: 5.23 MB
Date added: 04-06-2026

Project Brochure and Poster

WPIP_MIPV_Brochure_12_pages_final_AL

Size: 30.70 MB
Date added: 15-10-2024

WPIP_MIPV_Brochure_12_pages_final_EN

Size: 31.31 MB
Date added: 15-10-2024

WPIP_MIPV_Poster_A2_Project_Overview_2026

Size: 13.22 MB
Date added: 05-06-2026

Campaign 'Friends of Water' 2025

Natural_Water cycle_poster

Size: 538.71 KB
Date added: 20-07-2026

Man made water cycle

Size: 365.70 KB
Date added: 20-07-2026

Liberthi i femijeve

This study book for children is not available as PDF here. For further information please contact Shukalb: [email protected]
Size: 828.60 KB
Date added: 20-07-2026

Broshura per mesuesit

This manual for teachers is not available as PDF here. For further information please contact Shukalb: [email protected]
Size: 1.31 MB
Date added: 20-07-2026