WPIP MIP V Investment Measures

UKR Elbasan - WPIP / MIP V investment measures

Drinking Water Supply works

  • Over 42.5 km of mains pipes will be replaced and about 3,000 new house connections will
    be installed
  • About 10,000 new individual water meters will be installed in Elbasan
  • New reservoir in Krasta e Madhe
  • Full rehabilitation of the existing reservoirs Krasta e Madhe and Krasta e Vogel
  • Upgrading of DMA sytem to improve network control and reduce loss of water
  • Implementation of SCADA* system for local and central monitoring and controlling of
    reservoirs, well fields and water distribution networks

Waste Water System

  • Construction of 3.4 km wastewater network to protect the well fields Krasta e Vogel, Mengel and Frigoriferi

Water pipe from reservoir Krasta e Madhe

Key impact: highly improved water supply - new control system - safe wells