Drinking Water Supply

  • Shengjin water supply system: Over 5 km new transmission main and rehabiltation of existing wells
  • Kodra Marlekaj: new distribution network (over 12 km pipes) and booster pump station
  • Kakariq & Gocaj Village Water Supply System:
    2 new wells, new reservoir and new distribution
    net work (over 16 km pipes)

Storm water system

  • Complete redesign of the stormwater network in order to capture a maximum of the outer/rural areas on the hillside and to avoid discharge to low-lying areas in the city-centre
  • Separation of wastewater from storm water in the network;
  • For Disaster Risk Reduction: new box culverts, sediment traps, construction and rehabilitation of stormwater pumping stations.

Waste Water System

  • Upgrading Wastewater Treatment Plant – new inlet pumping station, mechanical equipment

Key impact: two completely new networks - more safety for people from stormwater